Weifang Xinchang Chemical Co.,Ltd

Home> Industry Information> National Tender Group Group Ningjin Salt Chemical Industrial Park Cogeneration Project Heat Supply Condensate Water Treatment System Second Tender Notice

National Tender Group Group Ningjin Salt Chemical Industrial Park Cogeneration Project Heat Supply Condensate Water Treatment System Second Tender Notice

June 26, 2018

Tender Notice

Entrusted by the tenderee, the public tender for the heating and condensate treatment system for the cogeneration project of the Ningjin Salt Chemical Industrial Park of the National Power Investment Group was conducted.
I. Basic situation of the project
Tenderee: National Nuclear Power Planning and Design Institute
Design Unit: Shandong Thermal Power Design Institute
Project Location: Ningjin Salt Chemical Circular Economy Park, about 20km southeast of Ningjin County, Xingtai City.
Source of project funding: 20% of the company's own funds as capital, and other construction funds are planned to use bank loans.
The overall progress of the project: The project is scheduled to start in November 2016. The 1# unit is scheduled to be put into production on September 30, 2017; the 2# unit is scheduled to be put into operation on November 15, 2017. The first batch of auxiliary equipment will be delivered to the site by March 31, 2017.
Second, the tender bid section list
No. Item Unit Tender No. Title No. Quantity Unit Main Index Tender Document Cost (yuan) Remarks
1. National Power Investment Group Ningjin Salt Chemical Park Cogeneration Project HD-CT-01-2015-019 Heated Condensate Water Treatment System (Original Condensate Polishing Device) 1 set of condensate water treatment system output: 50t/h .
The condensate treatment system pipeline adopts mother control and the water tank is shared.
Number of condensing pools: 1 volume: 200m3 Structure material: polyurea anticorrosion
2 sets of iron filter, filtering Nominal accuracy: 5μm Material: 50m3/h/set
Two sets of condensate pumps, specifications: Q=50m3/h, H=120m type horizontal centrifugal pumps Material: S30408 stainless steel 1000
Third, bidder qualification requirements
(a) Basic qualification requirements
The bidder shall meet all the following requirements at the same time:
1. Enterprise legal persons registered in the territory of the People's Republic of China have legal personality as independent contractors.
2. With a perfect quality management system, it must hold an ISO9001 quality management system certification issued by a nationally recognized qualification agency or an equivalent quality management system certification and annual inspection records, with good pre-sales and after-sales services.
3. Bidders shall abide by the laws and regulations of the People's Republic of China.
The bidder must have the necessary financial, technical, design and manufacturing/procurement capabilities to perform the contract, have the appropriate qualifications for R&D, design, equipment manufacturing/procurement, and meet the following requirements:
a) Must be a legally and financially independent entity.
b) The bidder must have good bank credit and business reputation, and must not be in a situation that is not conducive to the realization of the purpose of the contract, such as bankruptcy, suspension of business, receipt of assets, or freezing; no violation of the law in operating activities within the first three years of participating in the bidding activities of the project. recording.
c) The bidder shall have implemented a quality assurance system that meets the requirements of the bidding documents. The bidder shall formulate and implement a quality assurance program based on the project tasks and responsibilities he undertakes, and be responsible for the effectiveness of the quality assurance program, the project quality and service provided, as well as the obligations and legal responsibilities stipulated in the contract. The bid solicitor will test the implementation and effectiveness of the quality assurance system formulated by the bidder through inspection, supervision and supervision.
d) If the bidder’s bid for the product has an import part, he must obtain an import license or an export license issued or approved by the competent authority of the exporting government. If an import permit is not obtained at the time of the bid, the bidder should submit a promise that he can obtain a permit from the relevant government authority.
4. There are domestic manufacturers directly supplied equipment, in principle, do not accept the intermediary agency's bid.
5. The Commonwealth does not accept bids from the Commonwealth.
6. Two or more legal persons whose legal representative is the same person, only one of them may participate in the bid for the goods subject to the same tender number. The bidder and the bidder’s parent company, wholly-owned subsidiary company, and holding company may only have one company participating in the bid for the goods subject to the same tender number.
7. There is no real or potential conflict of interest between the bidder and the bidder.
(II) Special qualification requirements
No. Tender No. Special Qualification
1. The hot water condensate treatment system (former condensate polishing device) shall have a registered capital of at least RMB 5 million or more; and shall have at least four items of the same type of products from the thermal power unit within five natural years before the cutoff date.
Note: The quantity of performance shall be based on the number of copies of the contract meeting the eligibility requirements. When submitting tender documents, the bidder must submit a copy of the contract that can prove that the bidder meets the eligibility requirements (provide the contract cover, signature and stamp page and characterization of the main technical parameters and scope of supply page), users and contact telephone number, vote The relevant certification materials for the transport situation, detailing the supply, completion status, and important quality issues and improvement measures. Otherwise, the tenderee has the right to treat the bid document as invalid.
Fourth, the issue of tender documents
(I) Time and place of sale
From December 30, 2016 to January 6, 2016 (excluding statutory holidays)

The above is the National Tender Group Group Ningjin Salt Chemical Industrial Park Cogeneration Project Heat Supply Condensate Water Treatment System Second Tender Notice we have listed for you. You can submit the following form to obtain more industry information we provide for you.

You can visit our website or contact us, and we will provide the latest consultation and solutions

Share to:

Send Inquiry

Home> Industry Information> National Tender Group Group Ningjin Salt Chemical Industrial Park Cogeneration Project Heat Supply Condensate Water Treatment System Second Tender Notice

Send Inquiry

Nassen

Mr. Nassen

Email:

Send Inquiry

Tel:86-536-2117708

Fax:86-536-2117708

Mobile Phone:+8615305363298

Email:

Address:Financlal Plaza, NO.4899,Dongfeng East Street, Gaoxin District, Weifang, Shandong

Mobile Site

Home

Product

Phone

About Us

Inquiry

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send